To the search and language selection Go to navigation To the contents To the footer and footer navigation

Frankfurt School of Finance and Management

The building is an institute for teaching and research. It is certified as mixed use education/office, as a significant proportion of the space (around 43%) is allocated to office use.

Steckbrief

Art der Maßnahme
New building
Gebäudetyp
University
Baujahr (Fertigstellung)
1/2017
Bauherr:in

Frankfurt School gGmbH

Architekt:in

Henning Larsen Architects (LPH 1-4)

MOW Architekten GmbH (LPH 5-9)

Fachplaner:in
  • Energy concept: solares bauen gmbh
  • TGA: Caverion Deutschland GmbH
  • Structural design: osd GmbH & Co. KG
  • Outdoor facilities: manmadeland (LPH 1-4); HKK Landschaftsarchitektur GmbH (5-9)
  • Building physics: osd GmbH & Co. KG
  • Building and room acoustics: Kurz und Fischer
Zertifikat und Systemvariante
Platin (DGNB)
DGNB Platin: System MIX 2012
Auditor:in/ Nachhaltigkeitskoordinator:in
Dr. Günter Löhnert sol·id·ar planungswerkstatt
Dipl.-Ing. Andreas Dalkowski

Gesamt-Erfüllungsgrad ( % ) / nach Hauptkriteriengruppen

Gesamt-Erfüllungsgrad (%)
82.1 %
Ökologische Qualität
75.9 %
Ökonomische Qualität
92.7 %
Soziokulturelle / funktionelle Qualität
81 %
Technische Qualität
74.9 %
Prozessqualität
93.6 %
Standortmerkmale
89.7 %

Flächen

BGF
38.120 m²

NGFa

33.565 m²
NF
19.375 m²

Energie

Primärenergiebedarf (EnEV)
126,48 kWh /m²a
Unterschreitung EnEV
-28 % (EnEV 2013)
Anteil erneuerbarer Primärenergie am Gesamtprimärenergiebedarf (%)
26 %

Ökobilanz (GWP) in kg CO2-Äqu./m²NGFaa

53,5

Kosten

Baukosten, gesamt brutto (KG 200 700)
107,5 Mio.
nur KG 300
50,7 Mio.
nur KG 400
30,5 Mio.
Lebenszykluskosten pro m² BGF
3.074,73 €/m² BGF (Preisstand 10/2017)

Besondere Merkmale

Allgemein

The building is an institute for teaching and research. It is certified as mixed use education/office, as a significant proportion of the space (around 43%) is allocated to office use.

By dividing the building into two sections, it was possible to create the mall in between. Five office towers rise above the four base storeys, which mainly contain the teaching and seminar areas.

The large urban slice of the previous building was thus broken up into smaller units. The resulting towers are offset against each other and contain modern and flexible office areas.

The building has a basement in order to create the necessary space for technical rooms, storage and some of the required parking spaces.

Energetische Qualität und Konzept
  • Natural gas CHP (thermal output, modulable): 212 kW
  • Reversible heat pump: 630 kW
  • Gas NT boiler as peak load boiler, reserve: 720 kW
  • Turbo compressor extraction (only during operation): 300 kW
  • 4 partial air conditioning systems with humidity recovery (50%) and heat recovery (up to 85%)
  • Extensive use of LED lighting
  • 62 kWp Photovoltaic system with an annual yield of 50 MWh/a
Weitere Qualitäten bzgl. Umwelt- und Ressourcenschonung
  • Rainwater harvesting (cistern, 208 m³) for the following areas:
    • Office areas from the 4th floor ( toilets + urinals);
    • Outdoor taps and outdoor irrigation;
  • Hybrid recooler
  • Electric filling station
  • Small wind turbine
  • Urban gardening (roof terraces)
Besondere nutzungsspezifische Qualitäten
  • Numerous attractive roof terraces/recreation areas
  • "Zeil des Wissens" (atrium) as a central access and communication space in the building
Lüftungskonzept

The ventilation systems for toilets, restaurant, bar and side rooms are equipped with recuperative double plates or counterflow heat exchangers, which achieve heat recovery rates of up to > 75%.

The systems have a heating coil to preheat the supply air up to the indicated maximum supply air temperatures. As corridors are also connected to the systems, supply air cooling is provided.

Partial air conditioning systems without a humidification unit are used in most common areas (foyer, offices, seminar, library, etc.).

The ventilation systems are equipped with regenerative heat exchangers as recommended in the energy concept.

Technische Qualitäten

To ensure energy-efficient operation, consumption data is recorded centrally at the following points:

  • All cooling generators
  • Electricity meters to record the electrical energy requirements of the cooling generators and the hybrid dry cooler
  • All consumer circuits from the control center
Prozessqualitäten
  • Noise avoidance concept for the construction site (container wall)
  • Variant of the Life Cicle Analysis (LCA) analysis for the facade
  • Waste logistics construction site as a separate trade